Integrated Cost and Schedule Control for Construction Projects

69,00 €
+ 5,49 € Envío

Integrated Cost and Schedule Control for Construction Projects

  • Marca: Unbranded
Vendido por:

Integrated Cost and Schedule Control for Construction Projects

  • Marca: Unbranded

69,00 €

En existencias
+ 5,49 € Envío

Política de devoluciones de 14 días

Vendido por:

69,00 €

En existencias
+ 5,49 € Envío

Política de devoluciones de 14 días

Aceptamos los siguientes métodos de pago

Descripción

Integrated Cost and Schedule Control for Construction Projects

I Preparing a Project for Construction. - 1. Work Environments within the Construction Industry. - 2. Common Descriptions of Work. - 3. The Project Statement of Expectations. - 4. Single Data Capture and Integrated Systems. - 5. Management Information Systems. - 6. Computer Applications. - 7. Project Statement of Expectations and Performance Models. - 8. Estimates and Budgets as Performance Models. - 9. The Schedule as a Performance Model. - 10. The Cost Curve and the Production Curve as Performance Models. - 11. The Planned Schedule of Values and Cash Income Curves as Performance Models. - 12. The Planned Cash Requirements Curve as a Performance Model. - 13. Production Forecasting and Analysis and Cash Analysis. - II Administrative Project Activity Flow. - 14. Prebid Activities. - 15. Preconstruction Activities. - 16. The Construction Phase of the Project. - 17. Job Closeout. - 18. Contract Administration. - 19. Cash Management Information and Strategies. - III Construction and Production. - 20. The Construction Team and Its Working Relationships. - 21. Administrative Prerequisites to Starting Construction. - 22. The Game Plan and Making It Work. - 23. Production Management. - 24. The Turnaround Document and Its Use. - 25. Performance Measurements. - IV Project Monitoring and Control. - 26. Schedule Update and Control. - 27. Projections to Completion. - 28. Update of Production Projections. - 29. Exception Reporting. - 30. Cost Control. - 31. The Schedule and Other Informational Procedures. - Appendix A. Preconstruction Job Planning. - Appendix B. Summary Levels of Detail for Project Informational Processes. - Appendix C. Cost Types and Their Uses. - Appendix D. Performance Ratio Comparisons. Language: English
  • Marca: Unbranded
  • Categoría: Referencia
  • Idioma: English
  • Número de páginas: 506
  • Fecha de publicación: 2012/02/02
  • Artista: Frederick W. Mueller
  • Editor / Marca: Springer
  • Formato: Paperback
  • Nº de Fruugo : 343654627-752835559
  • ISBN: 9781461597520

Entrega y devolución

Enviado en un plazo de 5 días

  • STANDARD: 5,49 € - Entrega entre lun 29 diciembre 2025–jue 01 enero 2026

Envío desde Reino Unido.

Hacemos todo lo posible para asegurarnos de que se le entreguen los productos que pida en su totalidad y de acuerdo con sus especificaciones. Sin embargo, si recibe un pedido incompleto o artículos diferentes a los que pidió, o hay alguna otra razón por la que no está satisfecho con el pedido, puede devolver el mismo o cualquier producto incluido en él y obtener un reembolso completo por los artículos. Vea la política de devolución completa